FPC Factory Audit Checklist: 25 Questions to Ask

A factory audit is not a tour. It is a structured check that the supplier can actually build what you need, control the process, and prove it with records. These 25 questions are grouped into five areas, written so that a purchasing or engineering team can use them on a supplier visit - and so that vague answers become obvious.

How to use this checklist

Ask for evidence, not assurances. For each question, score the answer as green (documented and shown), amber (plausible but not documented) or red (evasive). A supplier with three reds in the capability section is unlikely to be a safe choice for a demanding part, regardless of price.

Bring your drawing with you. The most useful questions are the ones asked against your actual stack-up rather than in general terms.

Group 1 - Capability and equipment

  • 1. Which constructions do you build in-house? Single-sided, double-sided, multilayer, rigid-flex - and which of these are outsourced. Ask for the boundary explicitly.
  • 2. How many lamination cycles can you run, and how do you control registration between layers? Multilayer flex depends on lamination control; this is where yield is decided.
  • 3. Do you drill in-house, and by which method? Mechanical versus laser, and what happens to via quality when the stack-up gets thicker.
  • 4. Which surface finishes do you run yourself? ENIG, OSP and immersion silver involve different lines and chemistry control; outsourced finishes add lead time and a second party to the quality chain.
  • 5. Do you have SMT assembly and test fixtures in-house? If not, who does it, and who owns the quality of the assembled result.

Group 2 - Process control

  • 6. How do you control coverlay registration? Ask to see the alignment method and what tolerance they hold before lamination.
  • 7. How do you control material movement after lamination and baking? Shrinkage affects hole position and outline; ask how they compensate and whether they measure it.
  • 8. How is etching controlled, and how is line width verified? Over-etching thins traces; under-etching leaves shorts. Ask for the inspection method, not just the target.
  • 9. How do you bond stiffeners, and how do you handle the stiffness transition? A hard step at the stiffener edge is a common cause of cracked traces later.
  • 10. How do you panelise, and how does that affect material utilisation and cost? The answer shows whether they are optimising for the panel or just for the drawing.

Group 3 - Quality system

  • 11. Which standards do you work to? IPC-6013 for flexible circuits, IPC-A-600 for acceptability, or a customer-specific specification. Ask which one governs your order.
  • 12. Which certifications do you hold, and can I see the certificates? A logo on a website is not a certificate. Ask for the certificate number and scope, and check the scope covers flexible circuits and the process you need.
  • 13. Which inspection steps are routine on every order, and which are optional? "We inspect everything" is not an answer; ask for the list and the sampling basis.
  • 14. How is non-conforming material handled? Ask about the disposition process: rework, scrap, concession, and who signs it off.
  • 15. What traceability exists per lot? Batch number, date code, panel ID, material lot - and whether it survives into the shipping documentation.

Group 4 - Documentation and engineering

  • 16. Who reviews my Gerber and stack-up, and do I get DFM feedback in writing before the quote? A supplier that quotes without engineering comments is pricing a drawing, not a product.
  • 17. Can you issue a stack-up drawing for my approval? This is the document that makes the build repeatable and comparable with other suppliers.
  • 18. What does your first-article inspection report contain? Ask for a sample report, not a description.
  • 19. How do you control engineering changes and file revisions? Ask how a new revision is prevented from slipping into an existing order.
  • 20. Which test records can you provide with shipment? Electrical test, AOI results, dimensional report - and whether they are per lot or per order.

Group 5 - Commercial and delivery

  • 21. What is your capacity against current load? A supplier at full capacity will delay your order; ask how they protect committed dates.
  • 22. What is your lead time for prototype and volume, and what usually causes delays? Listen for whether they name specific causes - that shows they measure them.
  • 23. What is your MOQ and how is tooling charged? Tooling is a one-time cost; ask whether it is re-charged on repeat orders.
  • 24. How do you package flexible circuits for export? ESD protection, moisture barrier, vacuum packing, and how panels are protected against bending in transit.
  • 25. What happens when a lot fails after shipment? RMA process, root cause investigation, corrective action and who bears the cost.

How to score the answers

Score every question green, amber or red, then look at the pattern rather than the total:

  • Any red in Group 1 (capability) - the part may not be buildable at all; clarify before continuing.
  • Two or more reds in Group 2 (process control) - expect variation between lots.
  • Reds in Group 3 or 4 - you will not be able to prove what you received, and disputes become opinion.
  • Reds in Group 5 - commercial risk rather than technical risk; decide with your buyer, not the engineer.

Red flags worth stopping for

  • Vague answers about which steps are in-house
  • Certificates that "we will send later" and never arrive
  • No written engineering feedback before a quotation
  • Reluctance to issue a stack-up drawing for approval
  • No lot-level traceability on the shipping documents
  • A price far below the others with no stated assumptions

Where this fits in the project

For the product range being audited, see our flexible PCB (FPC) page. For how quality is checked in production, read how to verify flexible PCB quality; for supplier selection in general, see how to choose a flexible PCB manufacturer. If you are comparing quotations, what drives FPC prototype cost explains the assumptions to check. Send your requirements through the contact page.

Frequently Asked Questions

What should an FPC factory audit cover?
Five areas: manufacturing capability and equipment, process control, quality system, documentation and engineering, and commercial and delivery terms. A visit that only tours the showroom and looks at samples tells you very little.
How long should an FPC supplier audit take?
A focused audit can be done in half a day if you arrive with a checklist and ask for evidence rather than opinions. Reviewing process records and talking to the engineer who will handle your project matters more than a long tour.
What is the most important question to ask?
Which steps are done in-house and which are outsourced. It changes who controls quality, how fast a problem is found, and what happens when a build goes wrong.
Should I audit the factory before or after sampling?
Ideally before a volume order and after a first sample, so you can compare what you were told with the part you actually received.
What are the biggest red flags?
Vague answers about in-house capability, certificates that cannot be produced on request, no written DFM feedback before quoting, and no traceability per lot.

Planning an audit or a new project?

Contact us with your project requirements through the contact page. Our team will explain how to submit Gerber files securely for review, then confirm production feasibility, lead time and quotation.